By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
Nice site
laterally supported pier foundation support a 1 storey house. 200mm*210mm concrete piers space 3.0m apart support the principal framing members. the 200mm thick footing supporting the pier are located 900mm below the base of the piers.based on the prescriptive requirements in div.b,9.15., the maximum permitted height of the piers measured from the top of the footing to the under side of principle framing member is
for load from a column exerts 600kn on dense silt directly beneath the footing.soft clay is located 1m below the footing and a water table at 900mm below the footing. based on section 9.4., the pressure on the soft clay is acceptable.
laterally supported pier foundation support a 1 storey house. 200 mm*210mm concrete piers space 3.0m apart support the principal framing members. the 200mm thick footing supporting the pier are located 900mm below the base of the piers.based on the prescriptive requirements in div.b,9.15., the maximum permitted height of the piers measured from the top of the footing to the under side of principle framing member is
How far the water sump can be constructed from pillar.Is it recomendable to construct 1feat near to pillar for 5floor building.
Great Work
This is a very nice one and gives in-depth information. I am really happy with the quality and presentation of the article.
I really like to appreciate the efforts you get with writing this post. Thanks for sharing
Thanks a lot, sir for these most useful articles on this site, Thanks sir.
I agree in civil engineerig you can be praised to showcase your creativity
Good information i want it
Many thanks
is there any body or company who can assess the strength of a 5 year old 10 story building which has developed some symtpoms?. He has to assess and give a detailed report on the condition of the building
I like it
very informative website
thanks to the people who r working on it.
hats off brothers
Personally i am learning alot, its brilliant
Thank you
what is a tension reinforced concrete column
Pls send us more details
I’m a mason looking for an engineer to be working with
A solution to shoring up building constructed over concrete drain pipe.
Very good site with lots of information..