By
Kaushal Kishore
Materials Engineer, Roorkee
The new Solani aqueduct on Ganges canal Roorkee was built with prestressed concrete which allows for longer spans and a simple more robust design compared to old bricks, lime- surkhi mortar masonry arches of the old aqueduct, in which 8.5 crores bricks were used, while iron railing used in the sides of two lanes were imported from England. This is interesting to note that materials bringing those days on ship from England to Indian ports take 6-10 weeks via the Suez canal or 3 to 6 months via the longer Cape of Good Hope. Calculate in it also time taken on road from Indian ports to Roorkee.
After retirement from University of now IIT Roorkee I joined M/S Roffe Construction Chemicals Pvt.Ltdd, Mumbai as it’s Chief Concrete Technologists afterwards I became it’s one of the Director.

AQUEDUCT picture taken on 7/10/2025
For the contractor of above aqueduct I designed M-40 grade of concrete with Roffe superpladticizer. Those interested may read my paper by visiting Google site and log in; Civil engineering portal The Ganges canal by Kaushal Kishore.
I had designed numerous concrete mix design almost all cements of India in this I find Utra Tech cement as one of best cement OPC and PPC both With Ultratech cement I had designed numerous concrete mixes from ordinary strength to M-80 grade concrete, self compacting concrete, shot crete concrete, fibre reinforced concrete, fly ash concrete and more There is life after retirement and after retirement I worked for 30 year’s which includes in free time working in home research and testing laboratory and numerous construction sites visits almost all India and outside India. At my age of 92 years I still work for 12 hours daily.
I had never worked for money. In spite of doing so gigantic work what to say about car I even do not have 2 wheeler not any of my house not a single inch of land in this world only pension from IIT Roorkee and few clothes
what is the basic ethics of civil engineering profession?
give your ideas on plastering stps?
hello sir this is mait singh final year b.tech student i wanna do some kind of project in the feild of geotech so can u give me some assistence in terms of topic and also relevent material related to that topic plz sir be specific thnks in advance to u sir
I am a student of final year Civil Engineering wanted information about getting started, please send me an email
Sir,
Will you guide the acceptable maximum size of coarse aggrigate in mix design as some time the size is 25 mm down if yes than how to made a change in mix design at site
i need idea for wood work plastering
give idea for M.E course
hello sir iam a btech final year civil engg student ,i have taken my final project in the field of highway engg i want do some practical work so plzzz help me what project i can do ,and recnt trend /new topic in highway engg
sir, i am about to start a project on civil engineering course as a final student. kindly help me topics and procedures.Thanks
Dear Sir,
I’m a civil engineer. I’ve finished my degree at 2008. I want to be professional as site engineer in Building. What shall i do? Please kindly help me!!!
sir.i tell about construction dams,major irrigation for high cost of
meterial.trans poration,estimate cost,data,location of site,avialab
le meterials
respected sir, please arrange to tell the procedure for the testing of strength of cement please ,
Pls tell me how the correction for water will be done for moisture content and water absorption. And is there any water absorption correction is required for crushed sand. also tell me procedure of how water absorption is and moisture content is calculated.
Respected sir,i wanna WANT TO DO SOME PROJECT IN CONSTRUCTIONS OF DAMS SO PLS CAN U ASSIST ME RELEVANT TOPIC TO THIS N THE STUF REQUIRED TO IT.I WILL BE GRATE FUL TO U.
sir,
I am a 2nd year engineering student persuaing degree course in civil engineering frm a well known university.But i don’t have much idea about its futre aspect n subjects of research.i am interested in taking any research work during summer holidays n after in India or abroad.
kindly look into the matter and help me to boost up my morals and enhance my skill.
waiting for urs positive reply
regards
Dear Sir…
please send me some information about the period of removing of form work .
Regards
I’m in my second year doing civil engineering and it seems OK with me.But I ask for your guidance especially in subjects like Hydraulics and structures as they seem to be difficult and time consuming.
Iwant to know about Disinfection related mathematical problem?
how much collge do you have to take.
Dear All
I request you people to make this site perfect, a complete solutions package to civil engineering problems. When you ask any question, make sure it is in proper shape and clear, which any one can understand easily. Kindly try to use proper english.
Thanks!