By
Kaushal Kishore
Materials Engineer, Roorkee
The new Solani aqueduct on Ganges canal Roorkee was built with prestressed concrete which allows for longer spans and a simple more robust design compared to old bricks, lime- surkhi mortar masonry arches of the old aqueduct, in which 8.5 crores bricks were used, while iron railing used in the sides of two lanes were imported from England. This is interesting to note that materials bringing those days on ship from England to Indian ports take 6-10 weeks via the Suez canal or 3 to 6 months via the longer Cape of Good Hope. Calculate in it also time taken on road from Indian ports to Roorkee.
After retirement from University of now IIT Roorkee I joined M/S Roffe Construction Chemicals Pvt.Ltdd, Mumbai as it’s Chief Concrete Technologists afterwards I became it’s one of the Director.
AQUEDUCT picture taken on 7/10/2025
For the contractor of above aqueduct I designed M-40 grade of concrete with Roffe superpladticizer. Those interested may read my paper by visiting Google site and log in; Civil engineering portal The Ganges canal by Kaushal Kishore.
I had designed numerous concrete mix design almost all cements of India in this I find Utra Tech cement as one of best cement OPC and PPC both With Ultratech cement I had designed numerous concrete mixes from ordinary strength to M-80 grade concrete, self compacting concrete, shot crete concrete, fibre reinforced concrete, fly ash concrete and more There is life after retirement and after retirement I worked for 30 year’s which includes in free time working in home research and testing laboratory and numerous construction sites visits almost all India and outside India. At my age of 92 years I still work for 12 hours daily.
I had never worked for money. In spite of doing so gigantic work what to say about car I even do not have 2 wheeler not any of my house not a single inch of land in this world only pension from IIT Roorkee and few clothes
I am creator of world because civil engineer is a second god
i proud to be a civil engineer
engg rocks
Am a 3rd year civil engineering student.
Am really happy to be a Civil Engineer.
this website is extremely helpful for ous which gives supplementary knowledge for ous.
Hello civilions,
I am an 2nd year civil engineering student,so our class need an working model for exhibition,can anyone suggest some topics?
what is the purpose of grade slab ? is it required for residential buildings ? can any one in this group help me to solve the issue
entire developments of human beings are solely dependent on civil engineering activities,
plz, send me the full mix details of M5 M10 M15 M20 M25 M30 M35 M40 grad of concrete.
Below means
M5=1:5:10
M10=1:3:6
M15=1:2:4
M20=1:1.5:3
M25=1:1:2
We design and build with resolute mind .we are great civilians
I am very much proud to be a civil engineer and and this site is very useful to all civil engineers.
i am proud of civil engg and this site very useful for all civil engg resume and fast study.
m very happiee to study civil engg…:)
i hve joined civil engnnrg at presnt…i too fl proud
I am very much proud to be a civil engineer and and this site is very useful to all civil engineers.
the road to success is always under construction………..so keep do hard work. And myself proud to become ”civil engg.”
I am proud that i am a civil engineer
I want to make a project ,i am final year student of civil engineering, very difficult project so any body help me plz
Civil engineer rocks. . . . .
am proud to be studying civil engineering!!!!!