By
Kaushal Kishore
Materials Engineer, Roorkee
The new Solani aqueduct on Ganges canal Roorkee was built with prestressed concrete which allows for longer spans and a simple more robust design compared to old bricks, lime- surkhi mortar masonry arches of the old aqueduct, in which 8.5 crores bricks were used, while iron railing used in the sides of two lanes were imported from England. This is interesting to note that materials bringing those days on ship from England to Indian ports take 6-10 weeks via the Suez canal or 3 to 6 months via the longer Cape of Good Hope. Calculate in it also time taken on road from Indian ports to Roorkee.
After retirement from University of now IIT Roorkee I joined M/S Roffe Construction Chemicals Pvt.Ltdd, Mumbai as it’s Chief Concrete Technologists afterwards I became it’s one of the Director.

AQUEDUCT picture taken on 7/10/2025
For the contractor of above aqueduct I designed M-40 grade of concrete with Roffe superpladticizer. Those interested may read my paper by visiting Google site and log in; Civil engineering portal The Ganges canal by Kaushal Kishore.
I had designed numerous concrete mix design almost all cements of India in this I find Utra Tech cement as one of best cement OPC and PPC both With Ultratech cement I had designed numerous concrete mixes from ordinary strength to M-80 grade concrete, self compacting concrete, shot crete concrete, fibre reinforced concrete, fly ash concrete and more There is life after retirement and after retirement I worked for 30 year’s which includes in free time working in home research and testing laboratory and numerous construction sites visits almost all India and outside India. At my age of 92 years I still work for 12 hours daily.
I had never worked for money. In spite of doing so gigantic work what to say about car I even do not have 2 wheeler not any of my house not a single inch of land in this world only pension from IIT Roorkee and few clothes
which infrmtn u need?
Dear Ram Can u send Data for water supply and sanitation for Domestic houses
Please send information regarding books, jobs, seminars etc… Related to civil engineering to me..
i studing a junior engg.in civil engg. That’s my last sem. This project sem. What project are done by me to took great compliment. Plz.reply
i want to know that at which position we are taking a lapping in columns for seismic zone and why?????
Can anyone get me some details on Geo-Polymer Concrete.
I was get useful information from this site.
thanks for all things.
have a good time…& hv a nc 2012…
what is the major different btw culvert and bridge?
Culvert is a small span structure without slab
bridge is long span structure with slab
Please send information regarding books, jobs, seminars etc… Related to civil engineering to me..
What is the difference between Filling in plinth and Mass filling in Plot
according to my knowledge….plinth is ht above ground level which is filled. & mass filling is when of plot may be placed which were slight damp previously or small lake which r filled by ‘kachra’ or some other thin on large area….which is used 4 plotting after long period run wen soil becomes stable
Filling in plinth means is there any restriction of depth?
Filling in plinth means filling done upto plinth level w.r.t. ground level. It is of less depth as required.
Mass filling in plot may be done to bring the existing ground level of the plot to the required or standard ground level of the area.
How many plot do we have in one acre of land.
set the dimension plz…
can we used M30 grade of concrete cube ( wastage cube) for solling in plinth area
reason of cracks are formed in the wall???
Barbrmy foundation wall is leaking due to its inhibition of Vmy can prevent excessive cracking
U.V.LOAD IN WHAT CASE HAPPEN IN FIELD.
What is CD structure on road ?
i have some problem when i’m building interaction diagram for R/C colum by Visual Basic.
hi there! i need a sample of bill of materials. could anyone help? please? thanks!!
What is the purpose of a bill of materials?
How fix plinth level of building
plinth level will take +30 of ur nearest road top
what is use of subject engineering drawing.?
To know the how to calculate the scale & covertion of the scale main object of the engg drng we know the basic of the drawing….
Its helps to understand AutoCAD and basically drawing helps us to reveals plans and elevation of structures.
there r so many subjects which we may think that they r not useful but it wil improve in our thinking & etv.. but overall it is is all waste comparing to our old educational system