What is the Settlement Under Foundations?

Posted in Soil Engineering | Email This Post Email This Post

To calculate the approximate value of settlement the following equations is used. This establishes a relationship between loads on foundations and settlement

q/P = C1(1+2d/b) + C2/b
where
q = load intensity, lb/ft2 (kg/m2)
P= settlement, in (mm)
d =depth of foundation below ground surface, ft (m)
b=width of foundation, ft (m)
C1 =coefficient dependent on internal friction
C2 = coefficient dependent on cohesion

More Entries :

Comments

Share Information

What is Civil Engineering

Journals Books And Softwares

Branches Of Civil Engineering

Civil Engineering Jobs

Knowledge Center

Civil Engineering Universities/Events

Gallery - Civil Engineering Pictures

Search


Author

Top Contributors

Yahoo Group - Civil Engineering Portal

Subscribe to EngineeringCivil.com


Powered by groups.yahoo.com

Recently Added

Civil Engineering Links

Spread the Word