Things Site Engineers Must Know

Posted in Student Corner | Email This Post Email This Post |
Print Friendly, PDF & Email

Minimum thickness of slab is 125 mm.

Water absorption should not be more than 15 %.

Dimension tolerance for cubes + – 2 mm.

Compressive strength of Bricks is 3.5 N /mm2

Maximum Free fall of concrete allowed is 1.50 m.

Advertisements

In soil filling as per IS code for every 100 sqm 3 sample for core cutting test should be taken.

Electrical conduits shall not run in column

Earth work excavation for basement above 3 m should be stepped form

Any back filling shall be compacted 95% of dry density at the optimum moisture content and in layers not more than 200mm for filling above structure and 300 mm for no structure

F soling is specified the soling stones shall be laid at 45° to 60° inclination (and not vertical) with interstices filled with sand or moorum.

A set of cube tests shall be carried out for each 30 cum of concrete / each levels of casting / each batch of cement.

Water cement ratio for different grades of concrete shall not exceed 0.45 for M20 and above and 0.50 For M10 / M15 contractor

For concrete grades M20 and above approved admixture shall be used as per mix design requirements.

Cement shall be stored in dry places on a raised platform about 200mm above floor level and 300mm away from walls. Bags to be stacked not more than 10 bags high in such a manner that it is adequately protected from moisture and contamination.

Advertisements

Samples from fresh concrete shall be taken and at least a set of 6 cubes of 150mm shall be prepared and
cured. 3 Cubes each at 7 days and 28 days shall be tested for compressive strength. The test results
should be submitted to engineer for approval. If results are unsatisfactory necessary action/rectification/remedial measures has to be exercised.

Water used for both mixing and curing shall be clean and free from injurious amounts of oils, acids, alkalies, salts, sugar and organic materials or other substances that may be deleterious to concrete or steel. The ph shall be generally between 6 and 8.

Cement shall be tested for its setting.
1. The initial setting time shall not be less than 30 minutes.
2. The final setting time shall not be more than 10 hours.

Slump IS 456
Lightly reinforced 25 – 75 mm
Heavily reinforced 75 – 100 mm
Trench fill (insitu & Tremie) 100 – 150 mm (For Tremie no need of vibrator)

Curing Days Required
Super Sulphate cement : 7 days
Ordinary Portland cement OPC : 10 days
Minerals and Admixture added cement : 14 days

Advertisements

Cube Samples
1 – 5 M3 : 1 No.
6 – 15 M3 : 2 No’s
16 – 30 M3 : 3 No’s
31 – 50 M3 : 4 No’s
Above 50 M3 : 4 + 1 No of addition sample for each 50 M3.

Things Site Engineers Must Know About Reinforcement and Steel Bars

Check out the Unit Weights and Conversion which will be required on construction site here

We at engineeringcivil.com are thankful to Er Vikrant for submitting this construction site check list which is of great use to all civil engineers.

More Entries :
Comments
  • Kishore January 9, 2012 at 4:11 am

    I like this website a lot.It gives much information to a Civil Engineer

  • K.nageswara rao April 20, 2012 at 2:58 pm

    i like this site ihave lot of more information

  • nagendra babu May 6, 2012 at 3:37 am

    i like this site.give useful information for all of us

    • Aswath August 24, 2012 at 10:59 am

      agree with you

  • s r shreenivas June 6, 2012 at 2:51 am

    thank u for the details furnished here and it is more useful for the site persons to handle the project,

  • yashpal August 22, 2012 at 11:34 am

    i like it.

  • Mullai vendan September 27, 2012 at 10:53 am

    very good website for Engineers.

  • Tek Chand Thakur November 7, 2012 at 11:27 am

    good site. it gives the all the relevant information to all the working engineers and who want to proceed their career through this branch of engineering.
    i am so much grateful to owner of this site who has given the oppurtunity to people to know and grow up their knowledge about civil engineering.

  • Mohammad Walim November 23, 2012 at 1:04 pm

    i am so much grateful to owner of this site who has given the oppurtunity to people to know and grow up their knowledge about civil engineering.
    I really thankful

  • k.NAGABABU January 2, 2013 at 9:40 am

    THIS SITE IS MORE USEFULL FOR ALL CIVIL ENGINEERS

  • Chandan Manna February 28, 2013 at 6:42 am

    I like this website. it gives lot information to us.

  • Mahendran.T July 23, 2013 at 3:13 am

    Hi
    This site is realy good and very useful for every civil engineers.

  • karthi July 30, 2013 at 3:32 am

    Thank you for everything posted in this website to know about the civil engineering fields…

  • Itishree priyadarsini September 18, 2013 at 11:59 pm

    Its best site ..and a great thanks to this site producer..

  • Kgotso Hlagala January 29, 2014 at 3:11 am

    I’m a civil engineer trainee,believe me guys this is really awesome and useful.wish it can be updated everyday.woow wooow am flattered

  • G. DHANA LAKSHMI March 24, 2014 at 3:37 am

    I like this website. it gives lot information to us.

  • Naila Akbar April 5, 2014 at 2:00 am

    i am so much grateful to owner of this site who has given the opportunity to people to know and grow up their knowledge about civil engineering.
    I am really thankful

  • arjun April 6, 2014 at 6:13 am

    very useful information

  • Peeran July 6, 2014 at 11:17 am

    Superb

  • vikas singh markam July 22, 2014 at 1:51 am

    this is a very help full website for civil engineering student.the language they use is very simple and easily understand by students. If it is possible please provide more information about the question which should
    a civil engineer known.thank you

  • ankur saxena July 27, 2014 at 1:23 pm

    great site for a fresher as a trainee site engineer .helpful in proceeding my career in field of civil engineering. thanks for this information ..hope this site will keep doing better all time.

  • Post a comment

1 2 3 4