Help Others

I always appreciate people who come forward and try to help others.So in case you feel you have any content that is of some relevancy and usefulness to other civil engineers be it a presentation, report, any file, videos, pictures etc do mail to me at

admin@engineeringcivil.com

or just comment on the box below and one of our editors will contact you as soon as possible.

Thanks for being the part of your very own website

130 Responses to “Help Others”

Pages: « 1 2 [3] Show All

  • 101
    Prateek Agarwal Says:

    Can anybody tell what is the approximate cost for 4 m pile including excavation, bentonite treatment and concreting??

  • 102
    santhosh Says:

    i’m doing 3rd year civil engg in tamilnadu i want good project titles please help me

  • 103
    Kumar Says:

    good project titles please
    Santhosh,pl be in detail to help you as civil Engg has so many fields.

  • 104
    Kumar Says:

    Prateek Agarwal
    approximate cost for 4 m pile
    what dia? what type of pile? Where is the location?How many Nos?I hope you don’t do only one pile.

  • 105
    DILIP Says:

    WHAT CAN I DO AFTER COMPLETING MY B.E.?ANY SUGEESIONS

  • 106
    saravanasundaram Says:

    Dear sir pl send me details regarding low cost housing

  • 107
    Kumar Says:

    AFTER COMPLETING MY B.E.?ANY SUGEESIONS
    Do ME!!
    More info….more suggestions.

  • 108
    Prasad Patil Says:

    i am in pursuing BE Civil final year and i want good project titles

  • 109
    rakesh syam Says:

    sir plz give me good title for project

  • 110
    gopal Says:

    good site…

  • 111
    Zahi Khan Says:

    The best site for civil engineers.

  • 112
    vivek Says:

    i need the project for my final year project of following material, any one wid the information of following…..

    1. Design of Flexible Pavement
    2. Design of Rigid Pavement
    3. Life-Cycle Cost Analysis of Pavements
    4. Pavement Management System
    5. Transportation Environmental Interaction

    please help if any 1 have such info.
    thnx in advance!!!!!

  • 113
    saria Says:

    sir, i the student of B.E. iwant to do the project on safty management in construction. is it good for degree level? please send me material for the same. i am wating 4 ur reply

  • 114
    YOGESH Says:

    HELP ME FOR FINDING THE MATERIALS ON STRUCTURAL AUDIT.

  • 115
    amit Says:

    i need quality control for concrete used in construction and how to check quality of concrete.

  • 116
    Manoj Kumar Says:

    Dear Sir/Madam
    Please send me regarding drainage methodology system like cleaning ,silt rubbish cleaning.
    with regards,
    manoj

  • 117
    Younus Ali Says:

    Amit
    for checking quality of concrete 0.15 x 0.15 iron moulds are used you have to cast test cubes which are then tested for compressive strength after 28 days , latest equipments like core cutters are being used etc.

  • 118
    Bhavik Says:

    i’m a 2nd yr civil engg student
    i want a report on road
    containing very basic level information of road construction

  • 119
    HANS Says:

    This is regarding PILES .Pl give what ever details you have rather than asking too many questions ?

  • 120
    prasad Says:

    Do the project on aluminium concrete formwork systems it is better project no of companies are used the aluminium concrete formwork system for hithrise buildings

  • 121
    prasad Says:

    M15(1:2:4)
    1/7*1.52=0.217 (Cement)
    2/7*1.52=0.434 (Sand)
    4/7*1.52=0.868 (Aggrigate)
    Dry volume of the Concrete is 1.52
    Total of the Mix(1:2:4) = 7

  • 122
    Lotuseyes Says:

    Can anyone plez suggest test method for rock compressive strength(Uniaxial). Am in a marine proj in Oman.Rocks are being used as armour stones.

  • 123
    CRN Says:

    Aproximate cost of 4 mt pile will be Rs.5500/=
    However it depends on location.

  • 124
    vijayalakshmi Says:

    vijayalakshmi madurai.
    please suggest me some topic regarding my phd on concrete

  • 125
    zackriya Says:

    Hi friends…. i’m facing dampness problem in my flats after testing and commissioning of
    plumbing… so i request you to give some good and quick ideas to resolve this issue…

    thanx……….

  • 126
    pawan Says:

    any men help me, civil 3rd sem nots or any materia or question plz send me..(1)s.o.m.(2)tbt(3)geology(4)civil draving & designet plz

  • 127
    mie Says:

    hye,
    i need to do monthly project report complete with cost anylsis..

    please help if any 1 have such info.
    thnx in advance!!!!!

  • 128
    prasan Says:

    hi i want M50 grade of concrete mix design by using silica fume.plz send the design mix

  • 129
    Prasad Says:

    Hi i want to prepare a abstract on 6 day inplant training with ce engg importance

  • 130
    k_sh1n Says:

    I need help. I’m doing my final year in CE. I want a good final year project title on Construction Management field. Please help me give a useful and challenging title so i can improve my knowladge and everyone can get benefit from it.

Pages: « 1 2 [3] Show All

Leave a Reply