What is the difference between cut-and-cover method and cover-and-cut method in tunnel construction?

“Cut-and-cover” method involves the construction of open cut at the first place, followed by the construction of tunnels under open excavation. Upon completion of the structure, backfilling and reinstatement would be subsequently carried out.

Advertisements

“Cover-and-cut” method involves firstly the construction of cover followed by the second stage in which construction activities are carried out under the cover. As such, the disturbance to the public owing to constructional activities could be reduced to a minimum.

This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Share this post

Kanwarjot Singh

Kanwarjot Singh is the founder of Civil Engineering Portal, a leading civil engineering website which has been awarded as the best online publication by CIDC. He did his BE civil from Thapar University, Patiala and has been working on this website with his team of Civil Engineers.

If you have a query, you can ask a question here.

Leave a Reply

Your email address will not be published. Required fields are marked *

Ask a question