Beam Reinforcement
Posted in Gallery-Construction Site |
Email This Post
The following picture is taken at a construction site and it shows the beam reinforcement. In any beam reinforcement, two things should always be kept in mind. These are Proper Lap and Ld
In case these are not properly provided as per the design the entire beam purpose is lost and beam loses its required strength. It has been found that if the beam is not properly reinforced, the entire structure is bound to collapse



dear sir,
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.
thanking u
dear sir,
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.
dear sir,
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.
And how to calculate detail qty for steel & concrete of staircase
Hi Sir,
Thanks for sharing your knowledge. Would be greatful if you provide the thumb rule for determining the dry material
contents in RCC & brick work…
Thanks in advance
dear sir,
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.
And how to calculate detail qty for steel & concrete of staircase
dear sir,
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.
And how to calculate detail qty for steel & concrete of staircase
dear sir,
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.
And how to calculate detail qty for steel & concrete of staircase
Reply
dear sir
pleas sugest me the simplest method to calculate da quantity of steel and other mmmmatereals cost for a single storey building
pls reply
dear sir,
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.
And how to calculate detail qty for steel & concrete of staircase
dear sir,
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.
And how to calculate detail qty for steel & concrete of staircase
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.
And how to calculate detail qty for steel & concrete of staircase
sir, pls i want 2 know d meaning of 56-Y1209- 250 T in slab design and also the meaning of 11-R1008- 300 in beam design… Thanks sir.
pls let us know to calculet the qty of cement,steel,sand and meatal by thumbrule.thanking you.
Respected sir
Please suges me the thumb rule for designing column beam and slab.thanks
Respected sir
please suggest curtail bar in beam bottom.
dear sir,
please let us know the thumb rule to calculate the quantity of steel and cement and sand required for rcc , and how to calcuate the cost of rcc of beams and coulmns ,slab etc.