M15(1:2:4)
1/7*1.52=0.217 (Cement)
2/7*1.52=0.434 (Sand)
4/7*1.52=0.868 (Aggrigate)
Dry volume of the Concrete is 1.52
Total of the Mix(1:2:4) = 7
Can anyone plez suggest test method for rock compressive strength(Uniaxial). Am in a marine proj in Oman.Rocks are being used as armour stones.
Aproximate cost of 4 mt pile will be Rs.5500/=
However it depends on location.
vijayalakshmi madurai.
please suggest me some topic regarding my phd on concrete
Hi friends…. i’m facing dampness problem in my flats after testing and commissioning of
plumbing… so i request you to give some good and quick ideas to resolve this issue…
thanx……….
any men help me, civil 3rd sem nots or any materia or question plz send me..(1)s.o.m.(2)tbt(3)geology(4)civil draving & designet plz
hye,
i need to do monthly project report complete with cost anylsis..
please help if any 1 have such info.
thnx in advance!!!!!
hi i want M50 grade of concrete mix design by using silica fume.plz send the design mix
Hi i want to prepare a abstract on 6 day inplant training with ce engg importance
I need help. I’m doing my final year in CE. I want a good final year project title on Construction Management field. Please help me give a useful and challenging title so i can improve my knowladge and everyone can get benefit from it.
Hi dear frnds..
projects and seminars topics which you all choices will be the best if there are interlinked so pls choose your topics in the best possible way…
some of them are
1.Structural Analysis of Structures(incl/exc software)-seminar(Restengthening of an existing RC structure)
2.Design of Highways – seminar(compound and simple curve effects on drivers)
3.High performance concrete – factors effecting c concrete
4.Case Studies of failed structures and there detailed reports..
5.Town Planning project with seminar..
6.design of a industrial Truss system.. Very imp in day to day life..
sir pls tell me good pepar Presentations
can any body tell what software kirby is using for peb designs
SIR….CAN U EXPLAIN ME ABOUT SUBMERGED MASS DENSITY METHOD?
what is form work removal time of 350×900 vertical column in 35 digri temp
quantity of material= 10 cu.m
quantity of dry material= 10*1.54= 15.4 cu.m
(1.54 is a constant value to calculate dry material)
ratio of concrete= 1:2:4
sum of ratio= 1+2+4=7
1/7*15.4= 2.2cu.m(cement)
volume of cement= 2.2/0.035= 62.86bags say 63bags
(0.035 is a constant value for cement to calculate bags in cu.m)
2/7*15.4= 4.4cu.m(sand)
4/7*15.4= 8.8cu.m(aggrigate)
cost of material,labour and carriage depend on you…
i m doing civil engineering final year from Pakistan and want to go abroad for MS can any 1 help me t advice me good university at UK,Canada. with good scholarship.
Can you Plz suggest a Good book for “repair and rehabilation of concret structure” and its free dolnload link.
I am stationed at PUNE.I AM CIVIL ENGG. WORKING IN CONSULTANT FIRM. WE REQUIRED R.C.C. DESIGNER who should be member of MIE
Please give the mix proporations of concrete for M10, M15, M20, M25 & M30 respectively