What is the mechanism of plastic settlement in fresh concrete?

Posted in Concrete Engineering | Email This Post Email This Post

Within a few hours after the placing of fresh concrete, plastic concrete may experience cracking owing to the occurrence of plastic shrinkage and plastic settlement. The cause of plastic settlement is related to bleeding of fresh concrete. Bleeding refers to the migration of water to the top of concrete and the movement of solid particles to the bottom of fresh concrete. The expulsion of water during bleeding results in the reduction of the volume of fresh concrete. This induces a downward movement of wet concrete. If such movement is hindered by the presence of obstacles like steel reinforcement, cracks will be formed.

This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

More Entries :

Comments
  • Rana Muhammad Saeed February 6, 2012 at 7:30 am

    What is the allowable limit for settlement of fresh concrete.

Share Information

What is Civil Engineering

Journals Books And Softwares

Branches Of Civil Engineering

Civil Engineering Jobs

Knowledge Center

Civil Engineering Universities/Events

Gallery - Civil Engineering Pictures

Search


Author

Top Contributors

Yahoo Group - Civil Engineering Portal

Subscribe to EngineeringCivil.com


Powered by groups.yahoo.com

Recently Added

Civil Engineering Links

Spread the Word