What is the function of introducing cement plug before pouring concrete in bored piles?

Posted in Piles Engineering | Email This Post Email This Post

It is a common practice in the construction of bored piles by adding a cement plug before concreting of bored piles takes place. One of the possible explanations is that the cement grout serves as a barrier and protects fresh concrete from being washed away by water inside pile bore. The cement grout helps to set aside water when the first batch of concrete is poured down from the tremie pipe. As such, the quality of fresh concrete is anticipated not to be seriously affected by water and this helps to improve toe imperfection problem.

This question is taken from book named – A Closer Look at Prevailing Civil Engineering Practice – What, Why and How by Vincent T. H. CHU.

More Entries :

Comments

Share Information

What is Civil Engineering

Journals Books And Softwares

Branches Of Civil Engineering

Civil Engineering Jobs

Knowledge Center

Civil Engineering Universities/Events

Gallery - Civil Engineering Pictures

Search


Author

Top Contributors

Yahoo Group - Civil Engineering Portal

Subscribe to EngineeringCivil.com


Powered by groups.yahoo.com

Recently Added

Civil Engineering Links

Spread the Word