What are the reasons of establishing minimum area of reinforcement and maximum area of reinforcement?

Posted in Concrete Engineering, Steelworks | Email This Post Email This Post

Beams may be designed to be larger than required for strength consideration owing to aesthetics or other reasons. As such, the corresponding steel ratio is very low and the moment capacity of pure concrete section based on the modulus of rupture is higher than its ultimate moment of resistance. As a result, reinforcement yields first and extremely wide cracks will be formed. A minimum area of reinforcement is specified to avoid the formation of wide cracks.

On the other hand, a maximum area of reinforcement is specified to enable the placing and compaction of fresh concrete to take place easily.

This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

More Entries :

Comments

Share Information

What is Civil Engineering

Journals Books And Softwares

Branches Of Civil Engineering

Civil Engineering Jobs

Knowledge Center

Civil Engineering Universities/Events

Gallery - Civil Engineering Pictures

Search


Author

Top Contributors

Yahoo Group - Civil Engineering Portal

Subscribe to EngineeringCivil.com


Powered by groups.yahoo.com

Recently Added

Civil Engineering Links

Spread the Word