Strengthening And Widening Of Existing 2-Lane Road To 4-Lane Dual Carriageway

Posted in Civil Engineering Presentations | Email This Post Email This Post

This isĀ  presentation on STRENGTHENING AND WIDENING OF EXISTING 2-LANE ROAD TO 4-LANE DUAL CARRIAGEWAY.

This project was undertaken by Er. Nikhil Aggarwal and we are thankful to him for contributing this to our site. Click here to download it

More Entries :

Comments
  • neha parikh April 7, 2008 at 3:46 pm

    thx 4 such a wonderful ppt..i really appreciate nikhil’s work.hope 2 see more such creation here on
    civil engineering portal

  • S.Venkatraman May 8, 2008 at 10:24 am

    It was a great work initiated by nikhil.It was almost a virtual tour of constructing a flyover.Keep the momentum live and i wish u a lot of such works in the coming future.

  • S.Venkatraman May 9, 2008 at 7:34 am

    A correction is needed in the slump of pile cap.In your presentation, it has been mentioned as 180 which should be 50 – 75 as per Table 1700-4 of MOST.

  • gowtham June 30, 2009 at 12:13 pm

    this is a wonderful work did by various Professionals i thank a lot for their sharing of knowledge

Share Information

What is Civil Engineering

Journals Books And Softwares

Branches Of Civil Engineering

Civil Engineering Jobs

Knowledge Center

Civil Engineering Universities/Events

Gallery - Civil Engineering Pictures

Search


Author

Top Contributors

Yahoo Group - Civil Engineering Portal

Subscribe to EngineeringCivil.com


Powered by groups.yahoo.com

Recently Added

Civil Engineering Links

Spread the Word