SLAB ON GRADE SUPPORT

Discussion in 'Environmental Engineering' started by hariandro, Apr 6, 2017.

  1. hariandro

    hariandro Novice

    Hi Engineers,
    I am looking for the best way to support an existing slab (300mm thick) on grade before excavation under the slab to pass my services. See attached; assuming the slab is weak and not reinforced. Also assume the soil to be weak.
     

Share This Page