Awarded as the best online publication by CIDC

Failure Analysis Of Mishap At DMRC On 12 July

It was 12th July 2009 which proved to be the darkest day in the history of DMRC. After achieving a milestone of providing a reliable and easy mean of transportation to the capital of India, it is now facing huge problems which are not only causing loss of human lives but also causing immense damage to the most reputed infrastructure organization of India. So far, this company has achieved every target ahead of schedule under the excellent guidance of Mr. Sreedharan.

Let us try understanding what went wrong on that disastrous day

On 12th July, 2009, while lifting segments of the superstructure, an accident happened in the Badarpur – Secretariat section near P-67. The pier cap of pier P-67 got collapsed causing subsequent collapse of the
(i) Launching Girder
(ii) Span between P-66 and P-67 which had got erected and pre-stressed, already
(iii) Segments of the superstructure for the span between P-67 and P-68.

The incident left 6 people dead and many injured.

Site Investigation
After visiting the site, following observations were noticed
1. The pier cap of affected pier (P-67) has sheared from the connection point of the pier and pier
cap. It is a cantilever pier cap. It was informed by the contractor and DMRC representatives that the support system for viaductwas initially designed as portal pier till the casting of the pier was over. The shop owners put up resistance against casting of the other leg of the portal and it was subsequently decided by DMRC that this would be changed to a cantilever pier, similar to P-68 which is still standing at site.

metro collapse Pier fall

2. It was noticed that the prop support of the cantilever has failed from its connection to the pier.

Advertisements

3. The top reinforcement of the cantilever beam does not have any development length into pier
concrete. As learned from the sources, the top reinforcement of the cantilever beam had an “L”
bend of 500 mm only.

p67-p68fall

There is very nominal (or no trace) of shear reinforcement at the juncture.

4. The launching girder has fallen below with the failure of pier cap. Also, the span between P-67
and P-68 has fallen inclined, supported by the ground at one end and pier cap (P-68) on the
other.

top-reinforcement

5. The boom of the crane, used for lifting the launching girder on 13 July, 2009, has failed in bending
and shows clear sign of overloading.

overloaded-crane-crash

Analysis
i. The pier (P-67) was initially designed as a leg of a portal frame and subsequently changed to support cantilever pier cap.

ii. The same method was followed for P-68 and P-66.

iii. The alignment of track here is in curvature and gradually leaves the median of the road to align on one side of the road.

iv. The longitudinal reinforcement of the pier was protruding by around 1500 mm beyond top of pier.

v. The top reinforcement of pier cap was 36 mm in diameter and had a development length of 500 mm. only as an “L” from the top. There was insufficient bond length for the structure to behave like a cantilever beam.

vi. During launching operation of the launching girder itself, this pier cap developed crack and work was stopped for couple of months. During this period, the cantilever pier cap was grouted in crack areas and further strengthened by introducing prop or jacketing.

vii. However, the behavior of the structure changed due to introduction of this jacket and the cantilever pier cap remained no more cantilever.

viii. The segments of superstructure for the span between P-66 and P-67 was erected and launched and the prop beam / jacketing could sustain the load to that extend.

ix. During the launching of superstructure segments between P-67 and P-68, only 6 segments could be lifted and the whole system collapsed when seventh segment was hooked for lifting.

Advertisements

The sequence of failure is as follows:
a. The support of the prop / jacket got sheared from its connection due to inadequate section / welding.

b. The cantilever pier cap which was behaving as a simply supported beam due to introduction of prop / jacket started behaving like a cantilever beam suddenly after failure of the prop which it can not sustain ( It was inadequately designed). So, the so called “cantilever pier cap” collapsed.

c. The launching girder / span between P-67 & P-66 / the temporarily erected segments between P-67 and P-68, all got collapsed in one go.

Crane Failure
The launching girder was lifted by the cranes. However, it needed to be pushed little forward for
unloading it on the ground. So, all the cranes were asked to stretch there booms by some length.
During this operation, the 250 MT capacity crane on extreme left exceeded it’s capacity and the
boom failed and broke down. Since, there were unequal loading on the 250 MT crane by it’s side,
that also failed and broke down. The crane of 350 MT capacity didn’t broke but it toppled with it’s
base. The 400 MT crane remained intact.

Final overview
a. It is concluded that the failure of pier cap occurred due to inadequate prop / jacket. This was coupled with failure of cantilever pier cap due to inadequate development length of top reinforcement of the cantilever pier cap.

b. The failure of the crane was a case of operational inexperience for such synchronized crane operation. The crane -1 did not have the requisite capacity for the extended boom length and radius. Once crane – 1 failed, the crane – 2 was loaded almost half of the launching girder amounting to around 200 MT. For the extension of boom and radius, it did not have the requisite capacity so it failed, too. The crane -3 was loaded more than it’s capacity. However, in this case the crane got toppled instead of boom getting sheared. The crane -4 did not undergo the severe loading due to failure of other 3 cranes and most of the loads got grounded by that time.

What it taught us?
a. Structural designs should be proof checked by experienced structural engineer.

b. Once failure observed, structure should be as far as practicable abandoned and new structure should be built up

c. More emphasis should be given on detailing of reinforcement to cater for connections and behavior of the structural components.

d. Any make-shift arrangement to save a failed structure should be avoided.

e. Reinforcement detailing in corbels, deep beams, cantilever structures should be checked as per the provisions of more than one type of Standards (both IS & BS should be followed).

f. Adequately experienced Engineer / Forman should be deployed for erection works.

This article has been written/submitted to us by a Civil Engineer and we are thankful to him/her for his so valuable inputs.

Share this post

Kanwarjot Singh

Kanwarjot Singh is the founder of Civil Engineering Portal, a leading civil engineering website which has been awarded as the best online publication by CIDC. He did his BE civil from Thapar University, Patiala and has been working on this website with his team of Civil Engineers.

If you have a query, you can ask a question here.

12 comments on "Failure Analysis Of Mishap At DMRC On 12 July"

venkat says:

Piercap failure : Detail of steel prop design and checking of welding must be as per standards. It seems that piercap failure is by combination of shear and bending moments. Design check necessary? Does other cantilevers with steel props maintained properly in future else we are waiting for disasters while line is operational?

Crane accident : Rescue operation must be by an experienced / dedicated team of experts for this kind of activity. Crane positions must be designed and approved and implement at site. Caterpillers / man baskets with cranes must be used for tie up of slings / ropes etc. Cranes and operators must be certified by competent agencies.

hssekhon says:

Kanwarjot !! you has done very appericiable work which provides a lot of technical knowlege
on whole episode for civil engineers who couls not physically visit the site due to
their personal reasons but can understand the causes and effects of under estimation of any project and its consequences later on.
with high regards.
hssekhon

Gandhi says:

Congrats, Good work in technical aspect. Civil engineers and company should get lesson from this incident and rectify it.

Ali Haider says:

There is few truth everyone should know,
Construction company Like GAMMON INDIA LTD ,Who don’t know how to use heavy equipments, in this case we know All three Cranes were on Last Boom ,they extended maximum booms. That’s why major Accident happen. safety team don’t know importance of certified Crane operator and Rigger they only know to show off Green Safety Helmet. Delhi Government should make inquiries that still DMRC wants to protect GAMMON INDIA LTD , before and after (12July2009) All testing agency has fail concrete structures, why DMRC not Published (Non Destructive Test) Report , how they doing this much project ,its true there is corruption ,Sincere investigation required to save people of a big country .
ALI Haider
Khanpur
New Delhi

suneil says:

It is a shame for the public and not the engineers.It is only because of the shop keepers(public) protest that the poor engineers were compelled to make a risky change in their technical designs.Changing portal support in to a cantilever and that too with quite inadequate anchor(development) length was an obvious shameful act by the engineers but it was under the severe public pressure that they were desperate to act in the manner.Let us not mix up engineering and politics and invite such mishaps.
SUNEiL
Ahmedabad

Kumar says:

Steel support for the concrete corbel? Very strange and never come across in my life.
I heard that a crack developed at the support and it was grouted subsequently.I hope in this juncture they might have gone for that external support.

scchadha says:

simple cantilever beam on one side of the pier cannot bear the heavy loads and have deflection on one side of the beam only without any control on deflection under heavy loads.such cantilever beams should not be provided.why columns as usual at the centre could not be provided inspite of available space?

SUSANTA KUMAR KARAN says:

Dear Sir,
Please explain about the five cracks developed in DMRC projects at
Noida.

regards,

Sushant

AKK says:

The failure shows that the cantilever pier cap was unable to bear the load of the structure which it supported alongwith the load of the launching gantry,RCC segments which were hanging thereupon and that of the RCC Segment being lifted at the time of collapse.The structure should have been thoroughly check for its load bearing capacity before supporting launching gantry upon P-67, particularly as the structure had developed crack. The RCC structure can not be strengthened by additional RSJ bracing, which was seen on site of collapsed structure.The engineers who permitted use of such structure for supporting launching gantry made a blunder.

Mansoor Vikio Bhanbhro says:

i havn’t visited the site nd dont know that wot waz the main cause…but obviously the failure of any structure depandz 1st on design engineer that whether he properly design nd analyse it or not! the 2nd reason goes on poor workman ship..may be design was suitable while unskilled labour nd engineer @ site dont concentrate on the material + placing of steel while casting the pier shaft/ pier cap…#3rd may be the crane operator was not enough experienced to handle the machine according to site conditionz…he may place the girder wid some height or drag the girder badly…actualy the true investigation only be possible while labour nd forman etc speakout the tactual thing whch haapnd …also unfortunately, in our region corruption goin on nd on day by day…
Mansoor Bhanbhro
Matiari, Sindh
Pakistan.

Olaleke olawale says:

What is the maximum lenght of a cantilever

senthil says:

It should be mandatory to prepare Placing drawing before , preparing the bar bending schedule. So that while preparing the drawing itself , the engineer can adjust the bars and reduce the scrap levels.

Leave a Reply

Your email address will not be published. Required fields are marked *

Ask a question