Construction of Railway Overbridge
Posted in Civil Engineering Presentations |
Email This Post
As part of the six month summer training, this project that is the construction of railway over bridge in Jalandhar Punjab was undertaken by Ishan Kaushal. In this presentation, the piles foundation along with the equipments used at construction site are discussed. Also it contains mix design as per Indian code and pile cap specifications.
We are thankful to Er. Ishan Kaushal for his contribution to this site.
Download Construction of Railway Overbridge.ppt
or


April 7th, 2008 at 3:51 pm
thanks to the contributor for making and providing the presentation…i was searching for related content on the net and i found this
Thx
April 8th, 2008 at 8:46 am
it is most important site
August 25th, 2008 at 5:29 am
please give me a overview of railway overbridge.
December 19th, 2008 at 4:30 am
thanx a lot 4 sharing knowladge with us
July 27th, 2009 at 12:58 am
thanx dude i really apreciate ur hard work
August 14th, 2009 at 5:37 am
For curing and strength the girders may given stream Curing but its bit costly.
Piling and the pilecap pic could have been added to the new ppl to understand.