Comparing the rate of “Formwork exceeding 300mm wide, horizontal or at any inclination up to and including 5o to the horizontal” with the rate of “Formwork exceeding 300mm wide, at any inclination more than 85o up to and including 90o to the horizontal”, which one is higher?

Posted in Concrete Engineering | Email This Post Email This Post

tem “Formwork exceeding 300mm wide, at any inclination more than 85o up to and including 90o to the horizontal” refers to formwork formed vertically and when compared with formwork erected in horizontal plane, the amount of falsework required is smaller.

The item “Formwork exceeding 300mm wide, horizontal or at any
inclination up to and including 5o to the horizontal” refers to formwork to be erected in horizontal position and in general it requires much falsework to support this type of formwork. Therefore, the rate for this item is higher than the one mentioned in the above paragraph.

This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

More Entries :

Comments

Share Information

What is Civil Engineering

Journals Books And Softwares

Branches Of Civil Engineering

Civil Engineering Jobs

Knowledge Center

Civil Engineering Universities/Events

Gallery - Civil Engineering Pictures

Search


Author

Top Contributors

Yahoo Group - Civil Engineering Portal

Subscribe to EngineeringCivil.com


Powered by groups.yahoo.com

Recently Added

Civil Engineering Links

Spread the Word