Search

Ask An Expert

Is structure engineering troubling you?
Do you face problems in solving even the basic problems?

If yes then look no further as engineeringcivil.com along with Er. Gobind Khurana and Er. Abhimanyu has taken an initiative to help civil engineering students in structure related queries. We are thankful to Er. Gobind Khurana, Er. Abhimanyu and Vincent T. H. CHU for being a volunteer in helping other engineers in solving problems related to structure design in R.C.C and Steel.

Expert 1
Name – Er. Gobind Khurana
Qualification:
1. Bachelor of Civil Engineering From Thapar University Patiala
2. Master of Structure Engineering from Delhi University.
Work Profile: Currently working as Consultant for structural problems in R.C.C and STEEL Design.

Expert 2
Name – Er. Abhimanyu
Qualification:
Bachelor of Civil Engineering From Thapar University Patiala
Training at site in Unitech ( during 6 month summer training)
Work Profile : Presently working as associate design engineer for Fluor Daniel India Pvt Ltd. Area of work is structural steel design and concrete foundations for both static and dynamics analysis ( mainly in oil and gas industry)

Expert 3
Er. Vincent T. H. CHU obtained the degree of civil and structural engineering in the University of Hong Kong. He is the author of the monthly column “The Civil FAQ” in the Hong Kong Engineer published by the Hong Kong Institution of Engineers and is the author of the civil engineering monthly columns “The Civil Q&A” and “The Civil Corner” on the websites on World Federation of Engineering Organization and the University of Science and Technology (American Society of Civil Engineers – International Student Group) respectively. He is the recipient of the Ombudsman’s Award 2007 under complaint-related category and Young Engineer of the Year Award 2008 (Merit) organized by the Hong Kong Institution of Engineers. He is also the author of the engineering book “200 Question and Answers on Practical Civil Engineering Works”, “Civil Engineering Practical Notes A-Z” , “Ask Vincent Chu (Common FAQ on Practical Civil Engineering Works)” and “The Underlying Reasons in Practical Civil Engineering Works”.

So if you have any query regarding the concerned matter, just drop a comment and we will try to solve it as soon as possible.

Comments
  • ARUNESH BAJPAI July 11, 2017 at 2:34 am

    Hi,

    I have a godown which was used for urea storage for few years. this godown was not plastered and its floor was also of bricks laid down on soil.
    when it was not in use for urea storage anymore, we have plastered its walls and for floor we have used concrete and then plaster of cement around 8 years back.

    Now problem is that too much moisture remains on floor throughout the year except summer. Moisture quantity is so much like somebody has watered the floor.

    We have other rooms in the vicinity of this godown and there is not such problem.

    Please tell me why it’s so and what can be the permanent solution for it.

  • sasi July 12, 2017 at 1:51 am

    Sir, i want to know, whether buried anchors can be used in continuous span bridges.? What are points to be checked while using buried prestressing anchors?

  • Sayed July 12, 2017 at 2:52 am

    What Should be the maximum variation percentage of weight of cube from average weight, please Advice ?

  • Avinash Vanarase July 15, 2017 at 1:36 am

    What should be the acceptance criteria for Cube Strength for HVFA Concrete? Usually its does not give target strength on 28th day.

  • Abina Paco July 15, 2017 at 11:37 am

    How is biomimetics done in civil engineering ? what are the principles?

  • krishna teja July 15, 2017 at 1:35 pm

    hello sir
    i am doing m.tech in structural engineering
    now i want to do project ..i am not getting any idea of that can give me any ideas about experimental partial replacement of fine aggregate and totally replacement of coarse aggregate

  • mohit beniwal July 19, 2017 at 6:11 am

    plastering of a wall decrease or increase the strength of wall??? Or plastering increase dead load of wall only

  • SHIVARANJANI July 19, 2017 at 12:13 pm

    Can i get a complete report on construction of commercial building?

  • SANKET BHATT July 20, 2017 at 1:39 am

    Sir if i didnt clear any govt. Exam…..then can i get any private jobs

  • Asis Das July 22, 2017 at 11:52 am

    can we construct underground house after construction of the complete house?

  • Archit July 27, 2017 at 1:15 am

    How can a composite slab(cold formed steel and concrete) bridge can be designed ?
    What are the books available for it ?

    • Anjani03 September 20, 2017 at 11:06 pm

      This book (Steel Designing 5th Ed.) has information on designing a composite member. If not then you can get the info from Caltrans.gov which has all the engineering related to documents.

      Hope this helps!!

  • MOHAMMAD SOHAIL July 29, 2017 at 9:53 am

    Respected sir,
    Sir i want to write a training report but i can not stand on to write the report. I see you blog how to write a project report and i really like it. Can you give me send the idea like project report blog than please give me the idea like project report.
    If you send the idea how to write training report on my email please send me.
    Our teacher give us to submit the training report on 10th august. So please you send me idea as fast as possible.

    Thank you sir

  • Deepak Narayanan July 30, 2017 at 6:49 am

    Sir,

    I am a finance professional working in Construction, hope you may resolve query. Earlier our estimates are based on DSR rates which are inclusive of taxes like Excise, Vat etc. However post GST 18 % tax is applicable on full value.

    Hence is there any published document to compare old DSR rates in GST regime

    Thanks
    Deepak

  • sandip sinojiya July 31, 2017 at 5:07 am

    IS limits for binder content test.for bitumen

  • Glen Matteson August 2, 2017 at 11:08 am

    Why would the webs of a plate girder bridge (deck type, for a railroad) be substantially shallower AT THE POINTS OF SUPPORT (piers) than along most of the span? (So far, I’ve found information only on bridges where the web depth is less NEAR THE MIDDLE OF THE SPAN (situations where apparently the girder is acting as a cantilever).

  • catherine Diamond August 3, 2017 at 8:24 am

    Why are these moorings called dolphins?

  • Sukhninder Singh August 4, 2017 at 6:40 am

    Sir, a structure has to be renovated and its a shop. in renovation the proposed 4″ wall is to be contructed over the 3′ cantilever projection. so plz help me that how to build this wall on projection.

  • Rajasekhara August 5, 2017 at 1:15 am

    What does one unit of slab mean,Which is used in estimating the cost of building in general terms?

  • Vikas August 7, 2017 at 9:58 am

    Sir please suggest me civil engineering topics for my final year project

  • Pothuru visweswara August 14, 2017 at 5:24 am

    Please give me some examples to find out the plinth area, built-up area and floor area for an industrial manufacturing company and its limitations.

  • Post a comment

1 150 151 152 153 154